franksidebottom wrote:
We were talking about this on Saturday, how much work actually needs done for us to be able to host a football match at BP? Does the work have to be fully complete for us to play the York game?
My view was as long as we have the heating and electrics working, have some sort of changing facilities for the players and a decent pitch then the game could go ahead The WRE surely doesn't need much work done to reopen, if the East Stand does need to be used could we not have temporary toilets and catering facilities? All the bars in the Main Stand are above the flood level so should be okay. The only stumbling block I could think of was the ticketing facilities but I'm sure somebody could come up with a reasonable solution.
I think the pitch could be the real stumbling block.
Floodwater, especially in the lower reaches of a river tends to be heavily contaminated by sewage. Because of the risk of infection from any injuries on the pitch and the health & safety environment we now live in, I expect the top layer will have to be removed and re-turfed. The new turf will then take some time to bed in, especially now that we are in the winter months.